-
Lead paint removal required the 1929 structure to be wrapped all summer, so researchers worked inside a tent of industrial-grade plastic.
Lead paint removal required the 1929 structure to be wrapped all summer, so researchers worked inside a tent of industrial-grade plastic. By TOM HESSEDaily Sitka Sentinel SITKA, Alaska — After a summer wrapped in plastic, the Sitka Sound Science Center got its day in the sun. Construction crews worked all summer on the two-story…
Loading posts...